Backed byYCombinator

Electrical Estimates
5x Faster

Stop wasting hours on takeoffs and estimates. Bidflow helps you do takeoffs and calculate project costs 5x faster with verifiable proof of work.

Book a Meeting
Bidflow Assistant
Generate an estimate for the data hall expansion in Ashburn. We need to add 2 new PDUs and associated feeders for Row F.
Ashburn_DC_Ph2_Power_R4.pdf
Page 42 • E-205
I've extracted the specs for the new critical power distribution. Here's the labor and material breakdown for the PDU installation and 400ft feeder runs from MDS-A.
Estimate Preview
300kVA PDU, 480V-208VQty: 2
4" EMT Feeder w/ 600 Kcmil Cu800 ft
400A Breaker, 100% Rated, 3PQty: 2
Total Estimated Labor124.5 Hrs

Trusted by Leading Electrical Contractors

Bass Electric
Infinity Electric
Checkmate Electric
AI-Powered Takeoffs

Counts You Can Trust

Our custom-trained AI model achieves 83.5% accuracy on electrical takeoffs. When it's not perfect, you're in control.

Takeoff Counting Demo

83.5% Accuracy

Custom-trained model built specifically for electrical takeoffs. Get most counts right, automatically.

Easy Overcount Removal

Spot an error? Click to remove overcounts instantly. No tedious recalculation needed.

Manual Add-Ons

Missed something? Add your own counts on top. You're always in control of the final numbers.

Auto-Sync to Estimate

Counts automatically flow into your estimate table. No copy-paste, no manual entry.

83.5%
AI Accuracy
100%
Your Control
5x Faster
Time Saved
AI Estimating Copilot

Win More Bids, Faster

Trained to think like an electrical estimator, Bidflow helps you populate estimate tables from your drawings and specs.

  • Save Hours Per Estimate
    AI reads specs and calculates labor—you focus on the review and adjustments.
  • Increase Revenue
    Submit more bids in the same time—capture opportunities you'd otherwise miss.
  • Reduce Errors
    Every calculation is backed by citations and verifiable proof of work.
Estimate Table Preview
3/4" EMT Conduit500 ft
Labor: 22.5 hrs • Material: $1,250
Panel MLO 200A 42CKTQty: 1
Labor: 8.0 hrs • Material: $850
Receptacles 20A GFCIQty: 12
Labor: 6.0 hrs • Material: $360
Total Estimate$12,450
Case Study

How Bass Electric Accelerated Their Estimating

"Our estimators used to spend hours pulling labor units and verifying specs. Now Bidflow helps us work faster while we focus on the takeoff and getting the numbers right."
Jeff Yee Jr.
Owner & President, Bass Electric
  • Reduced average estimate time by 5x
  • Streamlined takeoffs with live counting tools
  • Eliminated hours of document searching with AI spec analysis
Bass Electric Case Study

Ready to Estimate Smarter?

Stop wasting hours on takeoffs and estimates. We're serving leading electrical contractors across the Northeast Corridor.